Airport runway expansion project poorly planned

2013-02-12T00:00:00Z Airport runway expansion project poorly planned nwitimes.com
February 12, 2013 12:00 am

It's been a long time coming. Gary/Chicago International Airport should be up and running today.

The Times has informed readers over the years of the progress and always some problem pops up that wasn't addressed at the start. The bridge, overpass, tracks and now underground sewers need to be stronger, and the runway is still being talked about.

Planning this project was done poorly. The state board need to check records on spending. Bringing in an advertiser for an unfinished airport was a waste.

Four years have passed with a broken economy. Northwest Indiana needs this airport to provide hundreds of jobs, not just for seven board members and soon 11.

- Pat Tuleja, Schererville

Copyright 2014 nwitimes.com. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Follow The Times

Featured Businesses

Submit a Letter to Editor

We welcome letters from readers on any issue of public interest, and make every effort to publish as many as we can and in a timely manner. The Times will publish only one letter a month from a writer, and be sure to include your name, address and a telephone number for verification. Letters should be 150 words or less. They will be edited.

Letters may be submitted:
  • Via our submission form.
  • Via e-mail.
  • Via fax: (219) 933-3249 or (219) 465-7298
  • Via mail or by hand to our offices:
    • 601 45th Ave., Munster, IN 46321
    • 2080 N. Main St., Crown Point, IN 46307
    • 1111 Glendale Blvd., Valparaiso, IN 46383
    • 3410 Delta Dr., Portage, IN 46368
    • Please mark envelopes with "Attn: Letters"

Questions?

Email Editorial Page Editor Doug Ross or call (219) 548-4360 or (219) 933-3357

Poll

Loading…

Do you enjoy stargazing?

View Results